KITCHEN REMODELING

12 08 2017

GREETINGS

Very humid and some rain, my ideal weather.  My Roma tomatoes are  doing well, my cukes and pumpkins did not fair well , after two planting i have two cucumbers and a few pumpkins.  It was such a wet spring here that the seeds rotted.  Many of the sweet corn growers had there seeds rot twice and  grew starts and that is why some farms are so late in selling their corn.

KITCHEN REMODELING

The kitchen was a long needed much awaited and dreaded project.  It should have been done the year after i moved in but there were sills,  roofs to replace and the list goes on and on.      The decision was made and the work started  very soon after.  My family and friends have continued to be supportive and helpful in every way.   My son David is the person who started it all.  One of the main reasons for getting this done is that my knee is much worse and at this point I don’t know if another replacement is possible or will work.  So at some point I may be in a wheel chair for part of the time and need things to be workable.

The rat infestation was part of it too, they were eating through the walls and did other damage.  I am happy to say that most of them have packed their bags and the rest will be trapped.  There was hardly any insulation and some of the flooring was rotted because of the bad sink and a leaking pipe which we didn’t know about..  The floor required lots of work for Pat, my neighbor and my house fixer. 

Things will be moved around to make it more workable.  The fridge will be turned around,  having it face the work area will make things so much easier.  The pantry already has and additional door facing the kitchen.  This will make it easier too and I will be able to find things better.  The stove will be moved to the corner  which will make things easier and all the cabinets will have backs and bottoms!!!!!!!!  I will have more storage area and more work area and the kitchen will be more organized.  Yea!!!!

Pat was able to move my Great Grandmothers window and paced it above the new counter facing  pantry door.

This is phase one of the kitchen the second phase will be the wood stove area.  The stove and Goshen Stones which it stands on will have to be moved and a new foundation will have to be built, other cabinets will be removed and at this point I don’t know what else will happen.    Getting through the first part is all I can think about..

Help has come in all forms, from family and friends, thank you all for encouragement and help.

I am recovering from a fall in which I bent my unbendable knee which made me realize even more why this renovation was so needed.

Not being able to find things has been my nemesis these days.  A few days ago I put my car key down and it disappeared.   With only one key It meant that i was grounded.  For those who have never lost a key I am telling you how important it is to not do this.  My car had to be towed to the nearest dodge dealer and this simple key cost 110.  You can either pay the fee or not drive.  There ought to be a aw against this type of gouging.  I really despise the way cars have a hold on us today.  We have to have them but———————-

Many thanks for reading my blog on this lovely summer day.   Carole